Friday, January 11, 2013

Windows with Sol

The windows are almost all framed in.  Temperature wise the house is like a walk in freezer.  Most of the time the outside air temp is much warmer. 

Both the french doors have been removed opening up the upstairs master bedroom as well as the french doors separating the living room and old outside deck area downstairs too.  I am really hoping the look/layout will be cohesive and not look like cardboard shanty amateur night on hobo hill. 

The load bearing beam has been installed and the last remaining studs have been removed opening up the kitchen to the future living room.  *will add pics of that later

****
Oh, yeah the windows are being installed today! 